GFS was chosen to assist in design and oversee the installation of resinous flooring systems throughout the new stadium.
The project consisted of 120,000 SF of urethane cement flooring in back-of-house areas and 210,000 SF of decorative flake broadcast epoxy on the main and lower concourses.
GFS assembled a team of contractors to meet the aggressive construction schedule, which involved working in multiple locations on different levels simultaneously.
GFS worked closely with the architect and general contractor to integrate the concourse floor system into the overall design themes.
The project was completed on schedule and Globe Life Field hosted the 2020 World Series later that year.
Global Facility Solutions
Employment
To apply for a position with Team GFS, please send a cover letter together with your area of interest to: scott@TeamGFS.net
GLOBAL
FACILITY
SOLUTIONS
Get a quote:
Tel. 480-329-0186
Home
About
Contact
Facebook
Google+
© 2023 by Global Facilities Solutions